Management and traffic control -
Israel Railways: Railroads
The project included: signage and early warning systems, a system of detectors to detect the presence of vehicles that are present for a long time in the railway meeting area, checkpoints and gates systems. Connection to existing systems in the meeting such as cameras and RF detectors.
Establishing and managing a computerized maintenance system within the framework of Total Risk.
Status: Done / Done
![](http://images8.design-editor.com/94/9409457/3958%2f588804F4-58F7-286F-A4E0-DBF10D357B98.png)
+972-3-9632000
![Ariel Wimasor Traffic & Parking Control Ariel Wimasor Traffic & Parking Control](http://images8.design-editor.com/94/9409457/3958%2f55CF1ED0-4359-8763-F22B-DA764ADCD3A2.png)